Powered By Kitlog Pro v2.0
Marks Web Site
RV-7A
All
6-17-2008
< Previous Log Entry
Next Log Entry >
Date:
6-17-2008
Number of Hours:
4.25
Manual Reference:
10-1, 10-9
Brief Description:
Main and nose gear installation
I started the day by trimming the U-713C nose wheel fairing brackets. Then I assembled the nose gear components and lastly I installed all three gears onto the aircraft.
U-713C Nose gear fairing brackets trimmed
Nose gear leg components assembled
Main and nose gear installed
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-7A Home
Category
# Logs
# Hours
All
606
2383
Empennage
59
221
Engine
2
7
Firewall Forward
71
326
Fuselage
260
1134
Instrument Panel
25
102
Miscellaneous
46
158
Shop Supplies
1
2
Wings
142
433
Copyright © 2001-2024 Matronics. All Rights Reserved.